Esia Nathaniel
LVMH Group Confidential Proposal
Prepared For:
Laetitia Roche-GrenetSVP of Innovation
Signed
Bertrand LouveauHead of Procurement
Pending
Hélène ValadeDirector of Sustainability
Signed
Stéphane BonnaudHead of Material
Pending

From validation
to industrial scale.

A structured pathway from technical qualification to preferred supplier status within the Louis Vuitton supply chain.

Phase 01
Phase 02
Phase 03
2026 // Phase 01

Prototyping & Validation

Volume25 kg - 2 T
Timeframe90 days
TriggerLOI execution

This initial phase validates material performance within Louis Vuitton's manufacturing environment. Volume ranges from small lab samples (25 kg) to full prototype runs (2 tons), with all deliverables completed within 90 days of signing the Letter of Intent. Success criteria include passing LVMH's technical protocols and demonstrating compatibility with existing production workflows-confirming the material can move from concept to commercial consideration.

Pilot Volume500 KG
Rate: €95 / KG47,500
Lab validationLVMH Eco-Material Performance Protocol testing complete
Atelier trialsSkiving, stitching, and embossing tested on LV production tooling
Prototype componentsHandles and trim produced on standard production lines
Colorway alignmentSeasonal palette matching confirmed against reference library
Phase 1 material
2027 // Phase 02

Commercial Integration

Volume25 - 100 T
Timeframe90 days
TriggerMoU conversion

Following successful validation, this phase transitions the material into active commercial production. Volume scales from initial seasonal orders (25 tons) to broader category deployment (100 tons), with performance monitored over a maximum 90-day evaluation period across two collections. The checkpoints ensure batch consistency, customer acceptance, and after-sales performance meet Louis Vuitton's quality standards before committing to long-term partnership.

Commercial Volume25 T
Rate: €85 / KG2,125,000
Seasonal SKU integrationMaterial designated across SLG category - first commercial PO
Lot consistencyGrain and color variance within tolerance across all production lots
Field performance reviewWear, patina, and after-sales reviewed against KPIs
Sell-through thresholdSell-through rate ≥ agreed benchmark over two seasons
Phase 2 product
2028+ // Phase 03

Industrial Scale

Volume1,000+ T / yr
DurationOngoing
TriggerLTSA execution

The final phase establishes a long-term industrial partnership with annual volumes exceeding 1,000 tons. Triggered by executing a Long-Term Supply Agreement (LTSA), this ongoing relationship includes preferred supplier status, co-development initiatives, and integration into LVMH's sustainability reporting frameworks. The checkpoints represent continuous improvement milestones rather than time-bound deliverables, reflecting the mature, strategic nature of the partnership.

Industrial Volume150 T
RATE
65 / KG
PRICE
9,750,000
Preferred supplier listingInclusion in LVMH preferred supplier panel
Co-development partnershipTechnical partnership for exclusive surface finishes
LCA validationHigg MSI data integrated into supplier reporting framework
Digital product passportMaterial attribution in LV hangtags and communications
Phase 3 factory